MSG Team's other articles

9933 Information Technology and Business Alignment: Why it is Important

Introduction: What is IT Business Alignment and Why it is Important The saying about the Blind Men and the Elephant in which three blind men touch the Elephant and state different things without knowing that it is an Elephant, firms and organizations must ensure that their IT and business strategies are complementary and supplementary to […]

12580 BPM – The Problem with IT as a Solution

Although IT has been touted by the experts as being the bedrock of next generation of business in which large organizations encompassing several thousand employees will seamlessly operate in a global environment, there are a good number of issues to be resolved. However, as we have already seen the merits of using IT solutions as […]

10422 The Necessity of Backup Sites for BPO Companies

In previous modules on continuity of business, we had discussed how companies need to be prepared for any eventuality – natural or manmade. The discussion was on how fast alternative sites for backup and recovery are made functional in the aftermath of disasters. This article looks at the BPO sector in specific and the necessity […]

10041 Is Australia Really Recession Proof ?

Australia has a peculiar economic history amongst the developed nations. Whereas all other developed countries have faced some economic downturn in the past few years, Australia has avoided recession for 25 years now! This is a record of sorts wherein a developed economy has been continually growing for such a long period of time. The […]

11549 Criticisms of Globalization: Threats to National Sovereignty

It is not only about Profits Of the many criticisms of globalization, the prominent critique relates to the fact that globalization erodes national sovereignty and takes away the power of governments. By allowing international corporations and multinational businesses to set the economic (and often, the political agenda), critics argue that the nation state becomes irrelevant. […]

Search with tags

  • No tags available.

In any project involving outsourcing of warehousing operations, setting up a Distribution Center or Managing Plant logistics, if the project involves setting up a dedicated facility for the customer and the size of the project is huge; such project requires detailed attention and work from both parties. The buyer would have to detail the requirements in the RFQ document, and the 3PL service provider would have to work on designing a detailed solution.

The RFQ response document holds the key to showcasing the proposed solution and the vendors understanding of the requirement and capability.

In this article we proposed to cover the components of the solution design document in brief.

A response document to an RFQ will normally contain the following sections:

  • Covering Letter with List of Enclosures
  • Solution Design
  • Case Study of 3PL’s other works of experience in the similar industry with photos or video if possible.
  • Company Profile, Management Structure and financial information as requested in the RFQ,
  • Project Implementation information detailing project team, project sponsor and management team, proposed timelines and schedule, etc.
  • Pricing
  • Terms and Conditions of offer
  • Any identified deviations from the RFQ assumptions or requirements with justification
  • Any other information supporting the solution design.

Solution Design Document

Solution Design Document is the main part of a response document, which details the solution proposed matching with the requirements of the buyer.

Solution design generation is driven by Business Development team with the active involvement of a solution design team. The solution design team would have the required competence, engineering capability, and tools to prepare the design. Functional experts or Subject Matter Experts and operational experts are brought in to collaborate with solution design wherever required.

Once solution design is ready, it is reviewed by operations team and IT besides costing team for internal acceptance and approval before being submitted to the client.

A solution design normally consists of:

  • General:

    - Detailing business process, requirement and assumptions as understood from RFQ.
    - Inventory analysis and other data analysis and resultant assumptions made in design
  • Proposed Location:

    - Explain details about the selection of proposed site, facility drawing, layout and structural details including height, the number of bays, etc.
  • Proposed Infrastructure:

    - Proposed Racking and Internal Layout Design with explanation on storage type selection, number of locations, total storage capacity, etc. including technical details of the racking.
    - Material Handling equipment and details.
    - All other infrastructure and equipment details.
  • IT :

    - Proposed System/Application with technical information including possible enhancement requirements to support business operations.
    - Outline benefits of using the system and how it fits into buyer’s requirement
    - System and network architecture design map with Document interface requirements and other technical points relevant to enable interaction between 3PL and buyer’s systems.
    - Hardware and Network plan
    - IT infrastructure specification and list of equipment including RF equipment, labeling and printing machines, desktops, Laptops, etc.
    - Detailed implementation plan if possible.
  • Process/Operations:

    - Process document should provide complete overview of the internal operations process combined with systems and physical processes. This document should be able to give a clear picture to the reader and enable him to visualize the entire process within the facility.
  • Human Resource:

    - List of total manpower assumption worked out
    - Proposed operations management structure
    - Escalation Route and structure
    - Details on how recruitments will be managed for the project
    - Brief on company policy on hiring, recruitment and HR management practices
  • Other Information:

    - EHS, Safety & Security Management plan with details.
    - Maintenance Plan
    - Disaster Recovery Plan, including IT recovery.
    - Quality Policy and Quality systems implementation plan

Article Written by

MSG Team

An insightful writer passionate about sharing expertise, trends, and tips, dedicated to inspiring and informing readers through engaging and thoughtful content.


Leave a reply

Your email address will not be published. Required fields are marked *

Related Articles

Customs Clearance – Meaning, Scope and Documentation

MSG Team

Contract Logistics – Key block in Supply Chain Management

MSG Team

Contract Logistics RFQ Process

MSG Team