MSG Team's other articles

9698 How to Create and Read a Pareto Chart ?

How to Create a Pareto Chart ? A Pareto chart is one of the 7 basic tools of quality control. It is for this reason that every student of quality management needs to know how to prepare and how to read a quality chart. The procedure for the same has been listed below: Step 1: […]

12493 BPO and the Transformation of Process Work

In previous articles in this module, we have discussed how the BPO sector has evolved and some future directions for BPO companies in Asia. This article looks at a little known aspect of the BPO phenomenon i.e. the fact that the very nature of the process work has been transformed because of the emergence of […]

9512 Hammer and Champy’s View on Process

After the Japanese wave of business process management came the concept of Business Process Re-engineering which rocked the world of BPM. The idea of BPM and the resultant benefits have been mentioned below: What about Those Companies That Did Not Change As said earlier, the Japanese companies were able to understand the dimension of time […]

9701 How to Draw a Scatter Plot

When scatter plots were discovered, drawing them was a complex task. It often required the use of statisticians and scientists. In the more recent past most of the drawing has been automated. However there is still a large amount of human involvement as well as human judgement which is required. The steps are mapped as […]

9984 International Production and Operations Management (IPOM) – Meaning, Nature and Strategies

Introduction International production and operations management deals with production of goods and services in international locations and markets. It involves management process which has to take into consideration local production market (labor and capital) and international customer requirements. Nature of IPOM The foundation for international production and operations is no different to domestic production and […]

Search with tags

  • No tags available.

Bill of Material (BOM) is a base functionality of setting up production module of an ERP system. A manufactured item consists of components, which are used to build the product through production operation(s). The main use of BOM is to define product structure of a manufactured end item.

Routing is another important base of production module, which defines the method of manufacturing. Method or route to be followed for manufacturing a product is a prerequisite for setting up production module.

Bill of Materials: Any manufacturing process goes through various phases of production and at each phase, components (either work in progress or purchased) are needed. BOM details components required at various phases or levels of operations (either single level or multi level). In a multi level BOM, a parent/child relationship between successive levels is formed.

BOM is used both for production and planning purpose, as specified below:

  1. Defining a production bill of materials: The end item is described at highest level of BOM. Levels of BOM are defined indicating material-routing relationship at every level of operation. Thereafter, components are added at each level. An existing BOM can be easily modified to create a newer version of BOM. An Engineering Bill of Material from Engineering Data Management module may also be copied to make a production BOM. A generic BOM may also be modified to make a customized product with the help of Configuration Management module.

  2. Defining a planning bill of materials: Production of similar items (such as garments of same type but of different sizes) is linked through aggregate relationship under planning bill of material so that their long term plan of production/ subcontracting are not done separately.

Loops in BOM - While defining multi-level production bills of material, the user may mistakenly link a higher level item to its component at a lower level. This creates a data error and triggers an infinite loop for the manufactured item. This mistake is detected through utilities, which normally forms part of the module.

Bill of Material

Routing - The objectives of Routing module are:

  1. All tasks required to manufacture an item are determined.
  2. The work centers related to these tasks are identified.
  3. The sequence of task linked operations to be carried out on work centers or sub contracting work centers are established.

Department - An organizational unit that carries out a specific set of tasks. A department can be of various types such as work centre, service centre, sales office etc.

Work Centre - A Work Center is a place where production activities are performed. Resources (like men and/or machines) are linked to a work centre. Thus, a Work center is a group of resource units used as a functional planning unit. . Work centers may be departmental work centre or sub contracting work center.

Task - This term is used to describe any activity carried out on the shop floor. Work centers and machines (for machine tasks) are used to define tasks. Task may be of various types such as production, repair etc.

Work centre Task relationship - The task is linked to the work center if the work center is able to executing the task. Details such as set up time, production rate etc. are maintained under this relationship.

Routing Code - The routing code identifies a routing sheet. Multiple (alternative) routings are possible for each standard manufactured item. A routing selection can depend on the order quantity, which is called the Order Quantity Dependent Routing. A routing code is needed to be linked to the manufactured item.

Routing Operation - Here, series of routing steps that are carried out successively to produce an item is defined. The operations are identified by serial number, which indicates sequence of operations for the associated manufacturing process.

The main flow between business objects in Routing module is depicted below

Routing Model

Article Written by

MSG Team

An insightful writer passionate about sharing expertise, trends, and tips, dedicated to inspiring and informing readers through engaging and thoughtful content.

Leave a reply

Your email address will not be published. Required fields are marked *

Related Articles

Cost Estimate and Accounting in ERP

MSG Team

Configuration Control and Setting Up of Base in ERP System

MSG Team

Change and Risk Management in ERP Implementation

MSG Team